The project scope was to transition an existing three story office building (with basement) previously occupied by a telecommunications client into a school intended to serve a charter school, STRIVE Preparatory, in association with Denver Public Schools. The first phase of work was to modify the first floor and existing building system infrastructure to accommodate the change from Type B to Type E occupancy on the first floor, including a temporary cafeteria space. The second phase of work modified the second and third floors, including a multipurpose space in the basement. The third phase created a Kitchen, Gymnasium and Cafeteria space in the basement and converted the temporary cafeteria (from Phase 1) into classrooms.

Location

Denver, CO

Area

3,000 SF